Plumbing for Remodels in San Diego

A kitchen or bathroom remodel brings the plumber to the house twice. The first visit comes while the framing is still exposed, to run new pipe where the new fixtures will sit. The second comes at the end, after tile and cabinets, to set those fixtures and turn the water on. The first visit is the one you never see again, so it deserves the most care. We handle the plumbing for residential kitchen and bath remodels across San Diego, Monday through Friday from 8 AM to 5 PM, working for you directly or alongside your general contractor.

How the Plumbing Side of a Remodel Runs

  1. A walkthrough before demolition. We look at what the house has now: the pipe material, the main shutoff, the water heater, and whether the house is built on a concrete slab or has a crawlspace under the floor. If fixtures are moving, this is when you find out what the new layout takes. Our article on planning a plumbing layout covers which moves are easy and which are not.
  2. The permit. Inside City of San Diego limits, any alteration or addition to a home’s plumbing needs a plumbing/gas permit. We file for it before rough-in starts. Homes in La Mesa, Santee or Poway go through those cities’ own building departments.
  3. Rough-in. With the framing exposed, we run supply and drain lines to each new fixture location, tie in the vents, and set the shower valve body in the wall.
  4. Test and inspection. Under the California Plumbing Code, new supply and drain piping can’t be covered until it has been tested, inspected and approved. Drain and vent lines are filled with water and held for at least 15 minutes. Supply lines hold test pressure for the same 15 minutes without a leak. The City’s inspector signs off the rough-in before any drywall or ceiling goes up.
  5. Walls close and finishes go in. Drywall, tile, cabinets and counters belong to the other trades. Our job at this stage is to have finished and passed on schedule, so nobody is waiting on plumbing.
  6. Trim-out. Once the finishes are in, we set the toilets, faucets, shower trim and appliance hookups, run water through every fixture under pressure and check each joint. The final inspection closes the permit.

If opening a wall turns up something the walkthrough couldn’t show, such as a cracked drain or corroded supply pipe, we stop and explain what we found. Any added work is priced and approved by you before it goes ahead.

Choosing Your Own Fixtures

Many homeowners pick their own faucets, toilets and shower sets, and we install them. Two things keep that smooth. First, the shower valve inside the wall and the trim you see are made as a pair, usually by the same manufacturer, so the brand and valve model have to be settled before rough-in. Changing your mind after the tile is up can mean opening the wall again. Second, have the fixtures on site, or their spec sheets in hand, when we rough in. Supply heights, drain positions and the toilet’s rough-in distance all come from them.

Whatever you choose has to meet California’s rules. Every shower and tub-shower needs a pressure-balancing or thermostatic control valve, and the hottest water the showerhead delivers must be limited to 120 degrees F. New showerheads are capped at 1.8 gallons per minute. Our shower valve installation page explains the valve choices, and our faucet installation page covers matching a faucet to the sink.

You can get a price before you buy. One customer had the valves and supply lines for new sinks priced from two photos.

What the Plumbing Estimate Should Spell Out

A remodel bid that just says “plumbing” leaves too much open. Before work starts, you should see these items in writing, from us or from anyone else you’re comparing:

Item

What it should say

Permit and inspections

Who applies for the permit, and whether rough and final inspections are included

Rough-in, room by room

Each fixture that moves or is added, with the new drain, vent and supply runs it needs

Valves and stops

Whether old angle stops, shutoffs and the shower valve are replaced while the walls are open

Pipe found behind the walls

How replacing old galvanized or cast iron pipe will be priced and approved if demolition uncovers it

Gas

Any new or moved gas line for a range, cooktop or water heater

Fixtures

Which ones you supply and which the plumber supplies

Trim-out

Setting, connecting and testing every fixture at the end

Wall and floor patching

Whether patching around plumbing access is in the plumber’s price or the general contractor’s

Valves are the line people skip, and it’s the cheapest one to take care of with the walls open. In one 24-year-old house, we replaced the angle stops at every sink and toilet so none of them would start leaking later.

Fixing an Earlier Renovation

Some of the bathrooms we work in were remodeled before, and not well. We’ve repaired a shower diverter, escutcheon and handle left by a poor renovation, picking up the parts the same afternoon. We’ve fixed a leaking toilet set by another contractor, and a toilet drain leak from a previous owner’s work. If a room you’re about to remodel has a history of leaks, tell us at the walkthrough. Then we can look at those connections before anything new is tied into them.

Planning a kitchen or bath remodel? Reach us at (858) 567-0544, Monday to Friday from 8 to 5, and tell us what’s changing in the room and roughly when demolition starts. Floor plans or photos are welcome on the Contact Us form. Courtesy Plumbing has belonged to master plumber Tony Misleh since he opened it in 2007, and our remodel work carries contractor license CSLB #910268.

Contact Us

    For Same-Day
    Water Heater Service,
    Call Us On

    (858) 567-0544

    Check Out Our Ratings!